Independent grid & power systems consultancy · Great Britain

Practical grid advice for generation, storage and large demand.

Support for developers, investors and delivery teams, from early connection strategy through offer review, network engagement and delivery.

Taking on selected new engagements

Services

Grid advice for specific project decisions.

This may be a focused review, or ongoing ownership of the grid workstream where continuity is useful.

01

Connection strategy & feasibility

Compare credible DNO and transmission routes, identify constraint and reinforcement exposure, and focus time and land spend on positions worth advancing.

02

Applications & Gate 2 strategy

Shape competent applications, modification strategy and evidence, then deal with the practical programme implications of the reformed queue.

03

Offer & contract diligence

Turn connection offers and works agreements into a clear view of dates, costs, dependencies, liabilities, access rights and decision points.

04

Network engagement & challenge

Lead technical discussions with DNOs, TOs and NESO, close information gaps and challenge positions that are not supported by the engineering or the rules.

05

Curtailment & access risk

Assess non-firm access, ANM and constraint exposure so the connection assumptions used in the investment case are explicit and defensible.

06

Client-side grid lead

Own the grid workstream through development and delivery, coordinating studies, designers, network companies and senior project decisions.

Connections reform

Gate 2 offers are landing. Demand rules are still changing.

Projects now need to understand what their offer means, what should be accepted or challenged, and which dependencies could delay delivery.

Representative experience

Examples of the work.

Project names and details are anonymised to protect clients. Each example explains the issue reviewed and the decision it supported.

Transmission solar & BESS

01

Connection and programme strategy for projects at several-hundred-megawatt scale, including enabling works and transmission interface risk.

Connection offer challenge

02

Technical and commercial review of distribution and transmission offers, including reinforcement, charging, milestones and queue position.

Curtailment diligence

03

Independent review of ANM and non-firm access assumptions to understand the real operational and investment exposure.

Large demand due diligence

04

Route and phasing advice for identified sites in the 50–200 MW range, separating credible connection evidence from optimistic capacity claims.

Hybrid connection strategy

05

Advice on shared infrastructure, import/export structure and the connection implications of combining generation, storage and demand.

Portfolio prioritisation

06

Screening and comparison of network positions to direct development spend toward the strongest opportunities.

View the full experience page

Network interface

Comfortable on both sides of the table.

Experience working inside a GB DNO and directly with all GB DNO groups, NESO and the transmission owners. This helps when the published process does not answer the project's practical question.

NESONational GridSSEN TransmissionSP TransmissionAll GB DNO groupsIDNO interface

Commercials

Clear enough to budget. Flexible enough to be useful.

Ad-hoc advice is charged transparently. Defined outputs can be fixed-price; ongoing work can reserve regular capacity.

Hourly

£150/hour

Focused advice, review and network-facing support.

Day rate

£1,200/day

Best for workshops, deep reviews and defined work packages.

Retained

£1,200+ /month

Reserved capacity and continuity, scoped to the workstream.

Larger scopes may be fixed-price. Multi-day rolling commitments are quoted to reflect scope and reserved capacity. VAT is charged where applicable.

About

Independent and founder-led.

Walledge Davis Consulting is led by Kieran Davis MEng MIET, an electrical engineer specialising in grid connections and power systems.

Experience spans utility-scale renewable development, transmission-connected infrastructure and network planning within a GB distribution network operator.

The working style is direct: explain the engineering in commercial terms, identify what is evidence and what is assumption, then recommend a practical next action.

Start with the decision

Tell us what you need to decide.

Send an enquiry